Bathroom tiling
Complete bathroom refit including new tiled floor and walls tiled to ceiling. Plastic ply installed to floor to strengthen and decouple floor with a 2.5mm depth rather than inserting much thicker backer board or ply. Floor tiles ‘folded’ up wall to form a tiled ‘skirting edge’. Shower to be installed above bath and shower screen alongside bath, so all wall areas within shower screen areas have been tanked prior to tiling to ensure a 100% waterproof installation. Tiles cut around soil pipe rather than notching tiles even though this area is mainly hidden. Wall tile datum’s set with laser as glass mosaic border position around room is critical to avoid features. Chrome trim around window reveal with cream trim elsewhere, external trims meet with a three way mitre rather than inserting add-ons. All adhesives and grouts are flexible with coloured grout and silicon used on floor to compliment tile colours.